Winter Maintenance Team Prepare for Snow

As the Met Office warns of more snow to come this week, at Thomas Bow City Asphalt the winter maintenance team gear up to provide round-the-clock support to ensure clients maintain access.

The team are backed with the latest information direct from the Met Office and equipped with a range of equipment to suit our client’s needs from 7.5-tonne lorries to pick-up trucks to quad bikes – all mounted with the latest snow ploughs and gritting technology to ensure efficient clearance of footpaths, roads and car parks.

For smaller sites, the team can deploy hand tool crews and supply / maintain salt bins to ensure you are well-resourced to cope this winter.

For more information visit our Winter maintenance page or call 01159244555.

Back to News

Quick Enquiry